Nordhavn 76

$3,300,000 USD

  • Year2009

  • Length24.03

  • Beam21 ft

  • Draft7 ft 10 in

  • Cabins4

Overview

Take 5 was built to cruise the world in luxury, with safety and redundancy playing a key role. She was built in 2009 with the best of everything. There are many unique features on Take 5, one being the custom layout which allows for an extremely luxurious and spacious lower VIP cabin, which was achieved by reversing the spiral staircases going from the lower cabins upward to the pilothouse. Another result of this custom layout is the vast pantry spaces it provided on the main level near the galley. There truly is an amazing amount of storage on this vessel. The moment you walk in the aft salon door you really get a feel of the open and airy spaces aboard Take 5. Her machinery spaces were spec'd to be reliable and redundant, especially with the option of twin engines and triple generators. The navigation equipment also has many redundancies and is what you would expect to see on any expedition yacht. Many of the navigation systems have been upgraded over the years since Take 5 was first launched. Take 5 has spent her days cruising both coasts with a majority of her time spent here on the East Coast. She is a truly amazing vessel that is ready for her next adventure.

Recent Upgrades and Improvements thru 2022:

Headliners were refinished in 2021 and 2022
Engine start batteries were replaced in 2021
Davit was stripped down and rebuilt in 2019
Windlasses were stripped down and rebuilt in 2018
Hydraulic system was inspected by ABT in 2018
Large 17-foot Brig tender was purchased and installed in 2019
New 9.9hp engine was replaced on small tender in 2019
Main engine transmissions were inspected and rebuilt in 2018
Fresh water pump replaced in 2019
Torrid water heater replaced in 2019
Shafts were pulled and trued in Dec. 2021
Props were trued in Dec. 2021
Cutlass bearings replaced in Dec. 2021
25kw and 20kw Northern Lights gensets were replaced with new units in 2018
Main engine exhausts were rewrapped in 2018
Pilothouse monitors were replaced in 2019
SAT compass was replaced in 2019
Two (2) SAT domes were replaced in 2019
Oil cooling pump for gear boxes was installed in 2018
Air handlers were replaced in 2018
Cruisair HVAC chillers were replaced in 2019
Thru hull valves were replaced in Dec. 2021
New raw water strainers and piping to sea chest were installed in 2021
Secondary hyd. Cooling pump and valving was installed in 2019
Thrusters rebuilt in 2018
6000 engine hour service done in 2018

Recent Upgrades thru 2023:

New Dometic Cruisair tempered water HVAC chiller unit
New camera system
New Flir camera
Two (2) new independent icemakers
New Fisher Paykal dishwasher in galley
All new Sony TVs throughout
New Sonos audio system throughout
New high speed in-motion Starlink system
New 3-seat jet ski mounted on the foredeck
New SeaDek installed on the swim platform
New electric BBQ mounted in the cockpit on the FRP console
HVAC raw water pump was replaced with new unit
Gray water pump was replaced with a new unit
All new intake hoses were run to each generator

Contact Broker

Contact Flagship International today for a private conversation regarding this vessel.

Email Now

Marley Cutbush

Images